
Replacing Ilkeston's Awsworth Road bridge
Network Rail contracted heavy lifting specialist ALE to remove the existing bridge, weighing 425 tonnes, and install a new bridge, weighing 525 tonnes.
Video uploaded on 08/02/2017 08:44am.
Previous Pageذكذكتسئµ TV
17 April 2025
Network Rail contracted heavy lifting specialist ALE to remove the existing bridge, weighing 425 tonnes, and install a new bridge, weighing 525 tonnes.
Video uploaded on 08/02/2017 08:44am.
Previous Page